| 9/16" OSB Wall Sheathing |

|
| Ready for trusses |

|
| Start On Garage End WithTrusses |

|
| Sheathed, Drip Edge, and Underlayment |

|
| Shingles Done |

|
| Every Window has Drainage plane |

|
| Vapor Barrier and Wall Insulation |

|
| Basement Stairs |

|
| Siding Completed |

|
| Time to finish the interior |

|
| Attic Access |

|
| Sealed and Insulated like rest of Ceiling |
|
 |
|
|
|
 |
|
| 2x6 walls built on block basement |

|
| Porch Deck On |

|
| Trusses |

|
| Ready for Shingles |

|
| Ready for Siding |

|
| Garage Door Installed |

|
| Ready for Sheetrock |

|
| Pre-Finished Fiber Cement Siding |

|
| Exterior mostly complete |

|
| T&G Pine Ceiling, Cabinets Installed |

|
|
 |
|
|
|